The work comprises the design, construction, procurement, installation, testing and commissioning for the civil, structural, architectural and building services works of the elevated railway and of the maintenance depot. The elevated section of the railway starts from the northern end of Ba Son Area at the interface with the end of the Underground Contract Package 1 at Km 2+360.00 and continues through Van Thanh, Tan Cang and along Hanoi Highway for a total length approximately 17.2 kilometres and a total number of eleven (11) elevated stations. At Suoi Tien Terminal Station the alignment falls to a curved access track to the end of the elevated section at Km 19+532.62 and onto the entrance embankment ramp into the Long Binh Depot Site.

The period for completion of the whole work is estimated to be completed in 54 months.

The Employer: Management Authority for Urban Railways (MAUR).

The Contractor: Sumitomo – Cienco.6 Consortium (SCC).

The Employer’s Representative: NJPT Association.